© Rosatom Tech
Corrosion appeared after scale deposit
Water
Pipe wall
Scale deposit
Direction of the exchanged heat
1
2
3
4
5
12
13
To the steam header of the deaerator
To the regeneration system
Off
Secondary water
to special water treatment facility
To hydraulic pressure test; blowdown for monitoring instrumentation
14
6
7
8
9
10
11