Содержание
- 2. * Superstructures
- 3. * Superstructures
- 4. Crown flames passages
- 5. Lagnieu F2 front wall / concrete wall protection
- 6. E² - Trainings Furnace A - Affinage * Kamyshin F1 front wall repair 1 0 1
- 7. E² - Trainings Furnace A - Affinage * Kamyshin F1 front wall repair with concrete blocks
- 8. Infrastructures
- 9. Dog house angle bloc not enough air cooling
- 10. Extremity angle tank joint glass infiltration
- 11. Infrastructures
- 12. * Glass level corrosion, leakage potential ricks After 6 mouths in case of air cooling breackdonwn
- 13. * Throat angle block corrosion with bad air cooling….. And glass leakage
- 14. Infrastructures
- 15. * Infrastructures
- 16. * Water leack on electrode water jacket during 2 years without repair
- 17. E² - Trainings Furnace A - Affinage * Bubbler block corroded, important glass infiltration
- 18. *
- 19. Regenerateurs
- 20. * Checkers corrosion…….
- 21. * …and 3m checkers crushing, by-pass realization
- 22. Flames passage on regenerator’s crowns (checkers frequently locked )
- 23. Important raw materials deposits…… batch charger Mechanic problems
- 24. Tank air cooling preconizations Impact point : ~100 mm from top tank Air quantity : ≥25
- 25. Tank air cooling nozzles
- 26. * Area N°1 : 500pa Area N°2 : 1000pa Area N°3 : 250pa Area N°4 :
- 27. E² - Trainings Furnace A - Affinage * Bad nozzles shape 0 pa 0 pa 250
- 28. * 300 pa 0 pa 0 pa Bad nozzles shape in throat
- 29. Power point template lanscape Corrosion Speed evolution with temperature :
- 30. * Throat angle blocks after 11 years campaign with efficient air cooling (average air pressure nozzles
- 31. Saint-Gobain Emballage E² - Trainings Furnace A - Affinage E² - Trainings Furnace A - Affinage