Furnaces corrosion / prevention to improve the longevity of campaigns

Содержание

Слайд 2

*

Superstructures

* Superstructures

Слайд 3

*

Superstructures

* Superstructures

Слайд 4

Crown flames passages

Crown flames passages

Слайд 5

Lagnieu F2 front wall / concrete wall protection

Lagnieu F2 front wall / concrete wall protection

Слайд 6

E² - Trainings Furnace A - Affinage

*

Kamyshin F1 front wall repair

1

0

1

3

0

0

0

3

3

0

0

0

0

0

1

2

1

1

2

1

1

1

0

0

0

Визуальный осмотр

E² - Trainings Furnace A - Affinage * Kamyshin F1 front wall
со стороны горелочных блоков

1

2

2

2

2

2

2

2

0 - Уже упал, следующий слой видим , already felt down
1 - Коррозия или частично нарушена, но в положении, heavy attack wit missed part
2 - Нестабильный готов упасть., attacked
3 - Замещен silimanite кусок недавно установленной , changed tiles

Слайд 7

E² - Trainings Furnace A - Affinage

*

Kamyshin F1 front wall repair with

E² - Trainings Furnace A - Affinage * Kamyshin F1 front wall repair with concrete blocks
concrete blocks

Слайд 8

Infrastructures

Infrastructures

Слайд 9

Dog house angle bloc not enough air cooling

Dog house angle bloc not enough air cooling

Слайд 10

Extremity angle tank joint glass infiltration

Extremity angle tank joint glass infiltration

Слайд 11

Infrastructures

Infrastructures

Слайд 12

*

Glass level corrosion, leakage potential ricks
After 6 mouths in case of air

* Glass level corrosion, leakage potential ricks After 6 mouths in case of air cooling breackdonwn
cooling breackdonwn

Слайд 13

*

Throat angle block corrosion with bad air cooling…..
And glass leakage

* Throat angle block corrosion with bad air cooling….. And glass leakage

Слайд 14

Infrastructures

Infrastructures

Слайд 15

*

Infrastructures

* Infrastructures

Слайд 16

*

Water leack on electrode water jacket during 2 years without repair

* Water leack on electrode water jacket during 2 years without repair

Слайд 17

E² - Trainings Furnace A - Affinage

*

Bubbler block corroded, important glass infiltration

E² - Trainings Furnace A - Affinage * Bubbler block corroded, important glass infiltration

Слайд 19

Regenerateurs

Regenerateurs

Слайд 20

*

Checkers corrosion…….

* Checkers corrosion…….

Слайд 21

*

…and 3m checkers crushing, by-pass realization

* …and 3m checkers crushing, by-pass realization

Слайд 22

Flames passage on regenerator’s crowns (checkers frequently locked )

Flames passage on regenerator’s crowns (checkers frequently locked )

Слайд 23

Important raw materials deposits…… batch charger Mechanic problems

Important raw materials deposits…… batch charger Mechanic problems

Слайд 24

Tank air cooling preconizations
Impact point : ~100 mm from top tank
Air

Tank air cooling preconizations Impact point : ~100 mm from top tank
quantity : ≥25 m/s et 1000 l/s/ml
When ? From heating up starting, only vertically cracks formation on tank (not horizontally cracks who increasing corrosion ).

Слайд 25

Tank air cooling nozzles

Tank air cooling nozzles

Слайд 26

*

Area N°1 : 500pa

Area N°2 :
1000pa

Area N°3 :
250pa

Area N°4 : 250pa

Throat ceiling
300pa

* Area N°1 : 500pa Area N°2 : 1000pa Area N°3 :
Air cooling
pressure measurement on nozzles example
In red color insufficient air cooling quantity (≥700 Pa)

Слайд 27

E² - Trainings Furnace A - Affinage

*

Bad nozzles shape

0 pa

0 pa

250

E² - Trainings Furnace A - Affinage * Bad nozzles shape 0
pa

Слайд 28

*

300 pa

0 pa

0 pa

Bad nozzles shape in throat

* 300 pa 0 pa 0 pa Bad nozzles shape in throat

Слайд 29

Power point template lanscape

Corrosion Speed evolution with temperature :

Power point template lanscape Corrosion Speed evolution with temperature :

Слайд 30

*

Throat angle blocks after 11 years campaign with efficient air cooling
(average

* Throat angle blocks after 11 years campaign with efficient air cooling
air pressure nozzles : 1000 Pa)

Слайд 31

Saint-Gobain Emballage

E² - Trainings Furnace A - Affinage

E² - Trainings Furnace A

Saint-Gobain Emballage E² - Trainings Furnace A - Affinage E² - Trainings
- Affinage

Throat angle blocks after 5 years campaign with insufficient air cooling