Казахстанское оборудование. График установки

Слайд 2

OLT

Установка
(3.5)

Проэктирован. / Произв.

Тест
(1.0)

Контрольный
(1.5)

Спец..

Детальн. план

Marking
(5/1∼5/30)

Design/
Production

OLT

Design/Production

Spec.

Detail
Plan

Utility Preparation

Marking

OLT

Spec.
Confirm

Install

OLT

Fabrication

Plan

Spec.
Confirm

Install/Test
(7/1∼7/31)

6/17,Start

9/2,Start∼

Design

Фундамент, Стальные конструкции

Пол,стены,крыша

Utility / finish

Инфрастр, ландшафт

OLT Установка (3.5) Проэктирован. / Произв. Тест (1.0) Контрольный (1.5) Спец.. Детальн.
и т.д.

Design/Production

order

HCr SOP
: ’21.1/1

HCr SOP
: ’21.1/1

7/1

6/1

5/20

1/28

Delay Construction

Revised

Тест 2
(1.0)

Prepare Install/Tryout
(8/1∼8/31)

Tender

Clinic Car
(8/15∼9/15)

6/1

SMPL Assemble(9/15)

5/1

Installation
(3.5)

Test
(1.0)

Cont.
Test
(1.0)

PILOT
(1.5)

Test

Cont.
Test

PILOT
(1.5)

Local Storage

Local Storage

Jig & Inspection Jig production
- Design/production: HMC
(Ass’y Jig: Astana)

)

Local
Structure Install

Local Trolley
Fabrication(9/30)

제작중단(3/16)

SKD Assemble: ’20.9/15

1/28

Unpacking

Local work and Building Complete

5/20

8/30

Utility, material and
chemical supply

9/15

Local Structure Install

5/20

Unpacking(5/15∼7/1)

Utility Supply(6/15∼ )

TLA : ‘19.9.23
SOP schedule change
? Plant construction delay(2M)
- Original : '20.11/1
- To be changed : '21.1/1

Сварка кузова (7/1)

Now

8/1

▣ График установки(1/2)

1. Install steel structure: ~ 5/30
2. Install 1st utility in the shop(ind water, air, electricity):~ 6/15
3. Epoxy primer on the floor: ~ 6/25
4. Move and unpack equipment into the shop: ~ 6/30
5. Prepare for manpower and tools for installation: ~ 6/30

1. Epoxy primer on the floor: ~ 5/25
2. Pave the roads around the paint shop(for the
equipment moving): ~ 5/30
3. Move and unpack equipment into the shop: ~ 5/30
4. Prepare for manpower and tools for installation : ~ 5/30
5. Install 1st utility in the shop
(ind water, air, electricity, gas, steam): ~ 5/30

1. Install steel structure: ~ 5/20
2. Install 1st utility in the shop
(ind water, air, electricity): ~ 5/20
3. Move and unpack equipment into the shop: ~ 5/20
4. Prepare for manpower and tools for installation: ~ 5/20

Utility Supply(6/15∼ )

Дата:15 Мая 2020

5/20

7/1

Установка (5/20)

Покраска (6/1)

6/1

4/1

Слайд 3

▣ Список вещей для установки (2/2)

▣ Список вещей для установки (2/2)

Слайд 4

▣ Состояние производства Казахстана

Дата :15 мая 2020

▣ Состояние производства Казахстана Дата :15 мая 2020

Слайд 5

▣ KAZAKHSTAN CKD Factory Equipment order status

1.WARE HOUSE
2.BODY SHOP
3.PAINT SHOP
4.PLASTIC PAINT SHOP
5.ASSEMBLY

▣ KAZAKHSTAN CKD Factory Equipment order status 1.WARE HOUSE 2.BODY SHOP 3.PAINT
SHOP
6.MAIN OFFICE

Date :15 th May 2020

Слайд 6

▣ Production facility progress status - Body

Spec.
Confirm

Manufacture

Design

OLT

Purchase/Order

Spec.
Confirm

Manufacture

Design

OLT

Spec.
Confirm

Manufacture

Design

OLT

Spec.
Confirm

Design

OLT

Spec.
Confirm

Manufacture

Design

OLT

Manufacture

Spec.
Confirm

Manufacture

Design

OLT

Spec.
Confirm

Manufacture

Design

Spec.
Confirm

Manufacture

Design

OLT

Arrival:1/28

(Local storage 5.0)

HCr SOP
: ’21.1/1

CMM
Install

Train
Programming

(Preparation from

▣ Production facility progress status - Body Spec. Confirm Manufacture Design OLT
local partner)

Stand by installation facility

OLT

Fabrication

Plan

9/2,Start∼

Design

Delay Construction

Revised

Prepare Install/Tryout
(8/1∼8/31)

Tender

6/1

8/1

4/1

(Local storage 5.0)

(Local storage 5.0)

(Local storage 5.0)

(Local storage 5.0)

(Local storage 5.0)

7/1

PILOT
(1.5)


Save

(3 month)

In stock

Date :15 th May 2020

Слайд 7

▣ Production facility progress status – Paint

‘21.1.1

SOP

Test

Spec.
Confirm

Install

Manufacture

Design

Test

Spec.
Confirm

Install

Manufacture

Design

Test

Spec.
Confirm

Install

Manufacture

Design

Test

Spec.
Confirm

Manufacture

Design

OLT

Test

Spec.
Confirm

Install

Manufacture

Design

OLT

Test

Spec.
Confirm

Install

Manufacture

Design

FlowTest

Spec.
Confirm

Install

Manufacture

Design /

Detail
Plan

Marking

OLT

Installation
(3.5)

Design/Production

Single-action/multi-action Test
(1.0)

PILOT
(1.5)

Spec.

Detail
Plan

Marking

Flow Test
(1.0)

HCr PE SKD

▣ Production facility progress status – Paint ‘21.1.1 SOP Test Spec. Confirm
Manufacture
(‘20.9/15)

Certificated vehicle

Single-action/multi-action Test

▷11/14 1 shipment
▷12/9 2 shipment
▷12/12 3 shipment
▷12/19 4 shipment
▷’20 1/14 5 shipment
▷’20 1/20 6 shipment
▷’20 2/2 7 shipment
▷’20 3/21 8 shipment

Stop producing(3/16)


Postpone installation for one month (standard4/13)
(5/1→6/1)

Date :15 th May 2020

Слайд 8

▣ Production facility progress status – Assembly

Design/
Production

Spec.
Confirm

Spec.
Confirm

Design/
Production

Install

Test

Spec.
Confirm

Design/
Production

Design/
Production

Spec.
Confirm

OLT

Installation

Design/Production

Single-action/Multi-actionTest
(1.5)

PILOT
(1.5)

Spec.

Detail
Plan

HCr SOP
: ’21.1/1

Flow Test
(2.0)

Flow Test

(Local

▣ Production facility progress status – Assembly Design/ Production Spec. Confirm Spec.
storage 3.5)

Single-action/Multi-actionTest

Install

Certificated vehicle from government

Flow Test

Certificated vehicle from government

Single-action/Multi-actionTest

Install

((Local storage 3.5)

((Local storage 3.5)

Single-action/Multi-actionTest

Certificated vehicle from government

Flow Test

Stand by installation facility

Arrival:1/28

(SKD Manufacut:9/15)


Clinic Car
(8/15∼9/15)

5/20

Date :15 th May 2020