Содержание
- 2. OLT Установка (3.5) Проэктирован. / Произв. Тест (1.0) Контрольный (1.5) Спец.. Детальн. план Marking (5/1∼5/30) Design/
- 3. ▣ Список вещей для установки (2/2)
- 4. ▣ Состояние производства Казахстана Дата :15 мая 2020
- 5. ▣ KAZAKHSTAN CKD Factory Equipment order status 1.WARE HOUSE 2.BODY SHOP 3.PAINT SHOP 4.PLASTIC PAINT SHOP
- 6. ▣ Production facility progress status - Body Spec. Confirm Manufacture Design OLT Purchase/Order Spec. Confirm Manufacture
- 7. ▣ Production facility progress status – Paint ‘21.1.1 SOP Test Spec. Confirm Install Manufacture Design Test
- 8. ▣ Production facility progress status – Assembly Design/ Production Spec. Confirm Spec. Confirm Design/ Production Install
- 10. Скачать презентацию
Слайд 2OLT
Установка
(3.5)
Проэктирован. / Произв.
Тест
(1.0)
Контрольный
(1.5)
Спец..
Детальн. план
Marking
(5/1∼5/30)
Design/
Production
OLT
Design/Production
Spec.
Detail
Plan
Utility Preparation
Marking
OLT
Spec.
Confirm
Install
OLT
Fabrication
Plan
Spec.
Confirm
Install/Test
(7/1∼7/31)
6/17,Start
9/2,Start∼
Design
Фундамент, Стальные конструкции
Пол,стены,крыша
Utility / finish
Инфрастр, ландшафт
OLT
Установка
(3.5)
Проэктирован. / Произв.
Тест
(1.0)
Контрольный
(1.5)
Спец..
Детальн. план
Marking
(5/1∼5/30)
Design/
Production
OLT
Design/Production
Spec.
Detail
Plan
Utility Preparation
Marking
OLT
Spec.
Confirm
Install
OLT
Fabrication
Plan
Spec.
Confirm
Install/Test
(7/1∼7/31)
6/17,Start
9/2,Start∼
Design
Фундамент, Стальные конструкции
Пол,стены,крыша
Utility / finish
Инфрастр, ландшафт
Design/Production
order
HCr SOP
: ’21.1/1
HCr SOP
: ’21.1/1
7/1
6/1
5/20
1/28
Delay Construction
Revised
Тест 2
(1.0)
Prepare Install/Tryout
(8/1∼8/31)
Tender
Clinic Car
(8/15∼9/15)
6/1
SMPL Assemble(9/15)
5/1
Installation
(3.5)
Test
(1.0)
Cont.
Test
(1.0)
PILOT
(1.5)
Test
Cont.
Test
PILOT
(1.5)
Local Storage
Local Storage
Jig & Inspection Jig production
- Design/production: HMC
(Ass’y Jig: Astana)
)
Local
Structure Install
Local Trolley
Fabrication(9/30)
제작중단(3/16)
SKD Assemble: ’20.9/15
1/28
Unpacking
Local work and Building Complete
5/20
8/30
Utility, material and
chemical supply
9/15
Local Structure Install
5/20
Unpacking(5/15∼7/1)
Utility Supply(6/15∼ )
TLA : ‘19.9.23
SOP schedule change
? Plant construction delay(2M)
- Original : '20.11/1
- To be changed : '21.1/1
Сварка кузова (7/1)
Now
8/1
▣ График установки(1/2)
1. Install steel structure: ~ 5/30
2. Install 1st utility in the shop(ind water, air, electricity):~ 6/15
3. Epoxy primer on the floor: ~ 6/25
4. Move and unpack equipment into the shop: ~ 6/30
5. Prepare for manpower and tools for installation: ~ 6/30
1. Epoxy primer on the floor: ~ 5/25
2. Pave the roads around the paint shop(for the
equipment moving): ~ 5/30
3. Move and unpack equipment into the shop: ~ 5/30
4. Prepare for manpower and tools for installation : ~ 5/30
5. Install 1st utility in the shop
(ind water, air, electricity, gas, steam): ~ 5/30
1. Install steel structure: ~ 5/20
2. Install 1st utility in the shop
(ind water, air, electricity): ~ 5/20
3. Move and unpack equipment into the shop: ~ 5/20
4. Prepare for manpower and tools for installation: ~ 5/20
Utility Supply(6/15∼ )
Дата:15 Мая 2020
5/20
7/1
Установка (5/20)
Покраска (6/1)
6/1
4/1
Слайд 3▣ Список вещей для установки (2/2)
▣ Список вещей для установки (2/2)
Слайд 4▣ Состояние производства Казахстана
Дата :15 мая 2020
▣ Состояние производства Казахстана
Дата :15 мая 2020
Слайд 5▣ KAZAKHSTAN CKD Factory Equipment order status
1.WARE HOUSE
2.BODY SHOP
3.PAINT SHOP
4.PLASTIC PAINT SHOP
5.ASSEMBLY
▣ KAZAKHSTAN CKD Factory Equipment order status
1.WARE HOUSE
2.BODY SHOP
3.PAINT SHOP
4.PLASTIC PAINT SHOP
5.ASSEMBLY
6.MAIN OFFICE
Date :15 th May 2020
Слайд 6▣ Production facility progress status - Body
Spec.
Confirm
Manufacture
Design
OLT
Purchase/Order
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Design
OLT
Spec.
Confirm
Manufacture
Design
OLT
Manufacture
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Manufacture
Design
Spec.
Confirm
Manufacture
Design
OLT
Arrival:1/28
(Local storage 5.0)
HCr SOP
: ’21.1/1
CMM
Install
Train
Programming
(Preparation from
▣ Production facility progress status - Body
Spec.
Confirm
Manufacture
Design
OLT
Purchase/Order
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Design
OLT
Spec.
Confirm
Manufacture
Design
OLT
Manufacture
Spec.
Confirm
Manufacture
Design
OLT
Spec.
Confirm
Manufacture
Design
Spec.
Confirm
Manufacture
Design
OLT
Arrival:1/28
(Local storage 5.0)
HCr SOP
: ’21.1/1
CMM
Install
Train
Programming
(Preparation from
Stand by installation facility
OLT
Fabrication
Plan
9/2,Start∼
Design
Delay Construction
Revised
Prepare Install/Tryout
(8/1∼8/31)
Tender
6/1
8/1
4/1
(Local storage 5.0)
(Local storage 5.0)
(Local storage 5.0)
(Local storage 5.0)
(Local storage 5.0)
7/1
PILOT
(1.5)
現
Save
(3 month)
In stock
Date :15 th May 2020
Слайд 7▣ Production facility progress status – Paint
‘21.1.1
SOP
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Manufacture
Design
OLT
Test
Spec.
Confirm
Install
Manufacture
Design
OLT
Test
Spec.
Confirm
Install
Manufacture
Design
FlowTest
Spec.
Confirm
Install
Manufacture
Design /
Detail
Plan
Marking
OLT
Installation
(3.5)
Design/Production
Single-action/multi-action
Test
(1.0)
PILOT
(1.5)
Spec.
Detail
Plan
Marking
Flow Test
(1.0)
HCr PE SKD
▣ Production facility progress status – Paint
‘21.1.1
SOP
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Install
Manufacture
Design
Test
Spec.
Confirm
Manufacture
Design
OLT
Test
Spec.
Confirm
Install
Manufacture
Design
OLT
Test
Spec.
Confirm
Install
Manufacture
Design
FlowTest
Spec.
Confirm
Install
Manufacture
Design /
Detail
Plan
Marking
OLT
Installation
(3.5)
Design/Production
Single-action/multi-action
Test
(1.0)
PILOT
(1.5)
Spec.
Detail
Plan
Marking
Flow Test
(1.0)
HCr PE SKD
(‘20.9/15)
Certificated vehicle
Single-action/multi-action
Test
▷11/14 1 shipment
▷12/9 2 shipment
▷12/12 3 shipment
▷12/19 4 shipment
▷’20 1/14 5 shipment
▷’20 1/20 6 shipment
▷’20 2/2 7 shipment
▷’20 3/21 8 shipment
Stop producing(3/16)
現
Postpone installation for one month (standard4/13)
(5/1→6/1)
Date :15 th May 2020
Слайд 8▣ Production facility progress status – Assembly
Design/
Production
Spec.
Confirm
Spec.
Confirm
Design/
Production
Install
Test
Spec.
Confirm
Design/
Production
Design/
Production
Spec.
Confirm
OLT
Installation
Design/Production
Single-action/Multi-actionTest
(1.5)
PILOT
(1.5)
Spec.
Detail
Plan
HCr SOP
: ’21.1/1
Flow Test
(2.0)
Flow Test
(Local
▣ Production facility progress status – Assembly
Design/
Production
Spec.
Confirm
Spec.
Confirm
Design/
Production
Install
Test
Spec.
Confirm
Design/
Production
Design/
Production
Spec.
Confirm
OLT
Installation
Design/Production
Single-action/Multi-actionTest
(1.5)
PILOT
(1.5)
Spec.
Detail
Plan
HCr SOP
: ’21.1/1
Flow Test
(2.0)
Flow Test
(Local
Single-action/Multi-actionTest
Install
Certificated vehicle from government
Flow Test
Certificated vehicle from government
Single-action/Multi-actionTest
Install
((Local storage 3.5)
((Local storage 3.5)
Single-action/Multi-actionTest
Certificated vehicle from government
Flow Test
Stand by installation facility
Arrival:1/28
(SKD Manufacut:9/15)
現
Clinic Car
(8/15∼9/15)
5/20
Date :15 th May 2020