Содержание
Слайд 2The measurement sequence
Push the button (1) to enable the IR-tester. Display (2)
The measurement sequence
Push the button (1) to enable the IR-tester. Display (2)
will turn on.
Install the IR tester on the DCO_Board_Frame. The IR transmitter (3) must match the measured area on the DCO_Board_Frame (4).
Please, watch the video
Install the IR tester on the DCO_Board_Frame. The IR transmitter (3) must match the measured area on the DCO_Board_Frame (4).
Please, watch the video
- Предыдущая
Комплексный скрининг. 1 триместраСледующая -
Пермакультура