Introduction of BQ

Содержание

Слайд 2


Bill of Quantities
Contents
Types
Formats
Advantages & Disadvantages

Contents outline

Bill of Quantities Contents Types Formats Advantages & Disadvantages Contents outline

Слайд 3

Last Updated:*

Bill of Quantities

WHAT THE CONTENTS

Last Updated:* Bill of Quantities WHAT THE CONTENTS

Слайд 4

Last Updated:*
Preliminaries
Specification
Measured Works
Prime Cost Sum
Provisional Sum

CONTENTS BILL OF QUANTITIES

Last Updated:* Preliminaries Specification Measured Works Prime Cost Sum Provisional Sum CONTENTS BILL OF QUANTITIES

Слайд 5

Last Updated:*

Define : The scope and nature of the work and contain

Last Updated:* Define : The scope and nature of the work and
details of the contract conditions to the project.
The aim is to provide a comprehensive schedule of items relating to:
The project generally
The contract
The employer’s requirements
Contractor general cost item
All items should be measured in lump sum
Examples; site office, site safety equipment, electrical installation and etc.

Preliminaries

Слайд 6

Last Updated:*
Details of the material quality and methods to execute the work.
This

Last Updated:* Details of the material quality and methods to execute the
is normally provided if the items are not drawn in the drawings. So during the pricing process, contractor must read the specification to price the works.
Examples:
All the floor tiles should use White House Brand only, and it should be standard colour of Blue.

Specification

Слайд 7

Last Updated:*
Measured works should cover all items/works in the drawing according to

Last Updated:* Measured works should cover all items/works in the drawing according
the group or element based on instruction under the SMM.
Element/group [ Example; Work Below Lowest Floor Finishes]
Each of the sub element is called items which refer to the work will be execute at site.
Example: Foundation
Excavation Works
Formwork
Reinforcement
Concrete Work

Measured Works

Слайд 8

Last Updated:*

All measurement of work should be referring to Standard Method of

Last Updated:* All measurement of work should be referring to Standard Method
Measurement of Building Works (SMM).
SMM provide basic information for measuring building works;
Method of Measuring
Description
Quantities
All items should be taking off using the traditional dimension paper or slip sort paper.

Measured Works

Слайд 9

Last Updated:*

Prime Cost Sums are the amounts included in Bill of Quantities

Last Updated:* Prime Cost Sums are the amounts included in Bill of
to be paid by the Main Contractor to the Nominated Suppliers or the Nominated Sub-Contractors, statutory undertakers, or utility companies on the Architect’s written instructions.
Used for works to be carried out by Nominated Sub-Contractors, statutory authorities or for goods to be supplied by Nominated Suppliers.

Prime Cost Sum (PC Sum)

Слайд 10

Last Updated:*

A Prime Cost (PC’s) is an agreed reasonable estimate for materials

Last Updated:* A Prime Cost (PC’s) is an agreed reasonable estimate for
(fixtures and fittings) which you may not have selected at the time of entering into the contract. Usually, PC’s are one-off item, however they can relate to a large number of items when the labour cost remain constant.
Examples may include kitchen and bathroom items, supplying the roofing tiles to site by the supplier and been laid by the roof tiler/skilled workers; Mechanical and Electrical Works by M&E Engineer.

Prime Cost Sum (PC Sum)

Слайд 11

Last Updated:*

Provisional Sums are the amounts included in the Bill of Quantities

Last Updated:* Provisional Sums are the amounts included in the Bill of
for works to be carried out by the Main Contractor which have not been specified in details at the time of tendering.
Used for works which cannot be fully detailed or for costs which are unknown at the time bills are prepared.
A Provisional Sum (PS’s) is reasonable estimate for material and labour of a particular part of the home which the builder cannot give a definite price for. The reason being the owner had not decided.
Examples; Swimming pool, landscaping and piling works.

Provisional Sum

Слайд 12

Last Updated:*

Bill of Quantities

WHAT THE TYPES

Last Updated:* Bill of Quantities WHAT THE TYPES

Слайд 13

Last Updated:*
Bill of Quantities based on Fixed Price/ Lump Sum Quantities;
Bill of

Last Updated:* Bill of Quantities based on Fixed Price/ Lump Sum Quantities;
Quantities based on Approximate Quantities;
Bill of Quantities based on Drawings and Specification.

TYPES BILL OF QUANTITIES

Слайд 14

Last Updated:*
A detail breakdown of all the quantities is shown in the

Last Updated:* A detail breakdown of all the quantities is shown in
BQ.
The architects and engineer prepare detail construction drawings.
QS measures the quantities in detail based on the construction drawings.
Both quantities and unit rates form part of the contract.
Virtual completion of the design proceeds the signing of the contract.
The empty bill is supplied to the contractors to tender the project.

Bill of Quantities based on Fixed Price/Lump Sum Quantities

Слайд 15

Last Updated:*
The QS prepare BQ based on the adjustment but subjected to

Last Updated:* The QS prepare BQ based on the adjustment but subjected
later adjustment.
The architects and engineer prepare detail construction drawings.
QS measures the quantities in detail based on the construction drawings.
Only unit rates form part of the contract.

Bill of Quantities based on Approximate Quantities

Слайд 16

Last Updated:*
Virtual completion of the design proceeds the signing of the contract.
The

Last Updated:* Virtual completion of the design proceeds the signing of the
empty bill is supplied to the contractors to tender the project.
The signing of the contract beginning of the project may proceed before the whole design is complete.

Bill of Quantities based on Approximate Quantities

Слайд 17

Last Updated:*
The contractors are supplied with drawings with full specifications.
The architects and

Last Updated:* The contractors are supplied with drawings with full specifications. The
engineer prepare detail construction drawings and QS measures the quantities in detail based on the construction drawings.
No empty bill is supplied to the contractors.
Virtual completion of the design proceeds the signing of the contract.
The contractor prepare their own BoQ.
Suitable for small project ( value of project less than RM500,000.00).

Bill of Quantities based on Drawings and Specification

Слайд 18

Last Updated:*

Bill of Quantities

WHAT THE FORMAT

Last Updated:* Bill of Quantities WHAT THE FORMAT

Слайд 19

Last Updated:*
Annotated Bills of Quantities
The annotations can be provided in a separate

Last Updated:* Annotated Bills of Quantities The annotations can be provided in
document, in a separate section of the bill or most usefully, facing each item on the back of the preceding page in the bill.
This format was developed as an extension of the location bill.

FORMATS OF BILL OF QUANTITIES

Слайд 20

Last Updated:*
Locational Bills of Quantities
The quantity for each item is broken down

Last Updated:* Locational Bills of Quantities The quantity for each item is
and allocated to a particular position within the project (e.g. particular building, a part of a building , a house type).
This format was developed to assist the more accurate pricing of items.

FORMATS OF BILL OF QUANTITIES

Слайд 21

Last Updated:*
Elemental Bills of Quantities
The sections are based on the functional elements

Last Updated:* Elemental Bills of Quantities The sections are based on the
of the building, normally those used by the Building Cost Information Service (BCIS) with the work in each elements being arranged in Uniclass works sections.
This format was developed to facilitate elemental cost analysed and as aid to cost planning.

FORMATS OF BILL OF QUANTITIES

Слайд 22

Last Updated:*

Bill of Quantities

ADVANTAGES & DISADVANTAGES

Last Updated:* Bill of Quantities ADVANTAGES & DISADVANTAGES

Слайд 23

Last Updated:*

Advantages

Provide an open basis for the contract; the client provides an

Last Updated:* Advantages Provide an open basis for the contract; the client
extensive and clear statement of the work he/she requires and the contractor states the price at which he/she is prepared to undertake the job.
Provide a very strong basis for financial administration of the contract.

Слайд 24

Last Updated:*

Advantages

Save the cost and time of several contractors measuring the same

Last Updated:* Advantages Save the cost and time of several contractors measuring
design in order to calculate their bids for competition.
Provide a consistent basis for competitive bids so that the contractor who is the most efficient and least expensive in providing the items of work is likely to be commissioned for the job.

Слайд 25

Last Updated:*

Disadvantages
BOQ covers major items also, still possibly variation may exist due

Last Updated:* Disadvantages BOQ covers major items also, still possibly variation may
to lack of specifications, revision on drawings, change in interest etc.
If planning & programming prepared based on the BOQ, consequently due to variations it may affect its scheduled planning & programming
Scheme and cost can be checked by other than intended parties also

Слайд 26

Last Updated:*
Last Updated:*

Q & A

Last Updated:* Last Updated:* Q & A