INPRO Action Plan “Legal and Institutional Issues of Nuclear Energy Supply by TNIs”: Scope, Contents, Definitions

Содержание

Слайд 2

Definitions

Definitions

Слайд 3

Transportable Nuclear Installation

The term “nuclear installation” has a number of definitions

Transportable Nuclear Installation The term “nuclear installation” has a number of definitions
under different international instruments:
Convention on Nuclear Safety: limited to “land-based civil nuclear power installation”
Paris and Vienna Liability Conventions: exclude any reactor with which means of sea or air transport is equipped

Слайд 4

INPRO domestic team: Transportable Nuclear Installations

“could be assembled and pre-tested at

INPRO domestic team: Transportable Nuclear Installations “could be assembled and pre-tested at
the factory”
“does not operate during the transportation”
no special requirements for the user's industrial and nuclear infrastructure
turnkey contract basis
can be returned to the manufacturer for maintenance or in the case of an accident

Слайд 5

Russian home team: Transportable Nuclear Installations

Serial production
Factory fabrication and pre-testing
Entirely removed

Russian home team: Transportable Nuclear Installations Serial production Factory fabrication and pre-testing
at the end of the lifetime
Minimal requirements for regional infrastructure

Слайд 6

Subject of the study
Legal issues
Institutional issues
Infrastructure issues

Subject of the study Legal issues Institutional issues Infrastructure issues

Слайд 7

Fundamental approaches

Fundamental approaches

Слайд 8

Two main extreme approaches
Incorporation into existing institutional framework (almost without any changes)
Creation

Two main extreme approaches Incorporation into existing institutional framework (almost without any
of a specific institutional framework (“all over again”)
Some reasonable compromise
has to be found!

Слайд 9

Scenarios

Scenarios

Слайд 10

Domestic INPRO team: Reference Life Cycle Scenarios

“Domestic” scenario
“Export” scenario
Supplier is operator
Receiving

Domestic INPRO team: Reference Life Cycle Scenarios “Domestic” scenario “Export” scenario Supplier
entity is operator
“Outsourcing” scenario

Слайд 11

Russian home team: Reference Life Cycle Scenarios
“Domestic” scenario
“International” scenario (“Supplier is

Russian home team: Reference Life Cycle Scenarios “Domestic” scenario “International” scenario (“Supplier is responsible for everything”)
responsible for everything”)

Слайд 12

Issues structure

Issues structure

Слайд 13

Issues Hierarchy (Russian home team)

Issues Hierarchy (Russian home team)

Слайд 14

Issues Hierarchy (INPRO Domestic team)

Issues Hierarchy (INPRO Domestic team)

Слайд 15

Issues studied

Issues studied

Слайд 16

Comparison of the issues considered

Comparison of the issues considered

Слайд 17

Additional issues of the study
(Russian home team)

Additional issues of the study (Russian home team)

Слайд 18

Liability for nuclear damage (Domestic INPRO team)

Two main assumptions:
Liability system for TNIs will

Liability for nuclear damage (Domestic INPRO team) Two main assumptions: Liability system
be based on the existing international instruments
TNIs is considered with respect to Vienna Convention (VC)
As a result the list of the issues that need further elaboration is presented.

Слайд 19

Liability for nuclear damage (Russian home team)

What has been done:
Review of international legal

Liability for nuclear damage (Russian home team) What has been done: Review
instruments related and their applicability to TNIs
Options for the liability transitions during the life cycle of the TNI
An expert estimation of the nuclear insurance contribution to the electricity cost

Слайд 20

Safeguards

Russian home team: considered not only safeguards but all the elements of

Safeguards Russian home team: considered not only safeguards but all the elements
non-proliferation regime
Both teams considered various specific scenarios of TNI deployment

Слайд 21

Safeguards

The main conclusions of the teams are practically the same. And they

Safeguards The main conclusions of the teams are practically the same. And
are as follows:
There is nothing that differentiates TNIs from conventional stationary nuclear installations with regards to safeguards.
In respect of non-proliferation TNIs are sufficiently covered by the existing institutional arrangements and do not require development of new rules and norms.

Слайд 22

Nuclear Safety (Domestic INPRO team)

The section contains the detailed review of the legal

Nuclear Safety (Domestic INPRO team) The section contains the detailed review of
instruments applicable:
Binding: Conventions related to Nuclear Safety
Non-binding: Safety Principals, Requirements, Standards

Слайд 23

Nuclear Safety (Russian home team)

The section contains the analysis of how the specific

Nuclear Safety (Russian home team) The section contains the analysis of how
features of TNIs and their life cycle influence the nuclear safety requirements for them.
As a result the list of the regulations recommended to develop is presented.

Слайд 24

Transport (Domestic INPRO team)

The section contains a review of the legal instruments related

Transport (Domestic INPRO team) The section contains a review of the legal
to the transport of TNIs:
Binding:
Law of the Sea
SUA Treaties and 2005 Protocols
Other binding modal instruments
Non-binding:
Safety norms
Security norms

Слайд 25

Transport (Russian home team)

What has been done:
Review of the existing legal framework related

Transport (Russian home team) What has been done: Review of the existing
to nuclear equipment or material transport
Output:
Recommendations for the future development of the legal framework for TNI transport

Слайд 26

Physical Protection (Domestic INPRO team)

Physical Protection section is presented as a part of

Physical Protection (Domestic INPRO team) Physical Protection section is presented as a
Nuclear Safety section. It considers legal instruments related to the issue.
Binding: CPPNM and 2005 Amendment, UN Security Council Resolutions UNSCR 1540 etc.
Non-binding: INFCIRC/225 (Rev.4)

Слайд 27

Physical Protection (Russian home team)

Identified:
Specific features of TNIs that are substantial with respect

Physical Protection (Russian home team) Identified: Specific features of TNIs that are
to physical protection
Specific threats that must be taken into account during the particular TNI project phase:
Design phase
Transportation to the operation site
Operation phase
Имя файла: INPRO-Action-Plan-“Legal-and-Institutional-Issues-of-Nuclear-Energy-Supply-by-TNIs”:-Scope,-Contents,-Definitions.pptx