Safety monitoring the progress of construction of production

Слайд 2

Characteristics of the facility construction

The project includes:
Demolition of the existing building emergency

Characteristics of the facility construction The project includes: Demolition of the existing
electrostatic precipitator.
Construction of foundations for equipment, new building and supporting metal.
Installation of steel building new gas treatment and supports.
Installation of flues.
Installation of equipment (conveyors, cyclone filter, smoke exhausts, valves, etc.).
Civil works (laying of utilities, interiors, landscaping, etc.).
Commissioning.

Слайд 3

Building a master plan

Building a master plan

Слайд 4

Occupational hazards in the production of construction

A moving machinery.
A moving car and

Occupational hazards in the production of construction A moving machinery. A moving
railway transport.
Work at height.
Work in confined spaces.
Pipelines steam, gas and water.
Vessels working under pressure.
Production design work includes:
installation of two cranes;
installation of protective enclosures; warning signs and labels;
arrangements for working at height;
measures to protect existing communications;
other information regarding safe work.

Слайд 5

Work at height

Provided by the project

Аctually

Work at height should be performed by

Work at height Provided by the project Аctually Work at height should
the permit to conduct hazardous work
Safety belts should be tested and have the appropriate tags.

Слайд 6

Welding

Provided by the project

Аctually

In the area of ​​production of welding must be

Welding Provided by the project Аctually In the area of ​​production of
the primary means of fire.
Production welding zone should be cleared of flammable materials.

Workplace welder must be safeguarded shields or screens.
When work is to be used certified welding, certified welding equipment and materials.

Слайд 7

Installation of a crane

Provided by the project

Аctually

Under the crane should be rigid

Installation of a crane Provided by the project Аctually Under the crane
base (tamped down, slag cushion).
In the location of underground cable must be laid concrete slabs.

Слайд 8

Fire shield

Provided by the project

Аctually

Fire shield should include:
fire extinguisher, water containers and

Fire shield Provided by the project Аctually Fire shield should include: fire
sand, asbestos cloth, gaff, shovel,
tapered bucket.

Слайд 9

The organization of safe passage

Provided by the project

Аctually

Passage of personnel operating organization

The organization of safe passage Provided by the project Аctually Passage of
next to manufacture construction should be organized with the help of enclosed pedestrian crossings.
Go through the trench should be organized with the help of bridges with railings.

Слайд 10

Fencing open apertures

Upcoming openings (pits, trenches and so on.) must be closed

Fencing open apertures Upcoming openings (pits, trenches and so on.) must be
on all sides with guards or alarm ribbons.

Слайд 11

In carrying out the construction site security monitoring revealed that Labour Organization

In carrying out the construction site security monitoring revealed that Labour Organization
meets the requirements safe production of construction - installation works , but there are violations of the occupational health and industrial safety.
Recommended:
Restore and equip a fire shield .
Store materials and construction in accordance with the schemes warehousing.
Strengthen the enforcement of regulatory requirements in the production of construction works

Conclusion of the work