Axes 5/023 Move monorail columns 350mm left

Содержание

Слайд 2

This walking level should be at elev. 6,5m, not the same of

This walking level should be at elev. 6,5m, not the same of
the ASU

We will have a step along this line

Axes 8/023

Слайд 3

Platform B – (022/10-11): adjust handrail according to Layout dimensions (right picture)

Axes

Platform B – (022/10-11): adjust handrail according to Layout dimensions (right picture) Axes 10/022
10/022

Слайд 4

Move monorail from 0,00 to 4,65 (platf. A1)

Axes 5/017

Also remember to provide

Move monorail from 0,00 to 4,65 (platf. A1) Axes 5/017 Also remember
removable handrail (1m centered)

Looks like you used same monorail of ASU, this should be smaller, it downloads only the empty filters of the Drypan

Слайд 5

Stairs to be minimum 1 meter for safety evacuation
(net dimension between handrails)

Axes

Stairs to be minimum 1 meter for safety evacuation (net dimension between
6/016
Axes 7/016

Слайд 6

Platform A1 - Booth area
Previous comments are still valid, see following slides

Platform A1 - Booth area Previous comments are still valid, see following slides

Слайд 7

Platform A1 - Booth area
Important: the 12 columns of the Spray Booth

Platform A1 - Booth area Important: the 12 columns of the Spray
have been modified after change of the Scrubber technology by Renault-VAZ

5,500mm

(Internal dimension to be respected)

(wrong)

Axes 5-6/013-021

Слайд 8

You forget the metal sheet and Omega Beam

Axes 5-6/014-015

You forget the metal sheet and Omega Beam Axes 5-6/014-015

Слайд 9

As you will see from our Booth layout & sections, the omega’s

As you will see from our Booth layout & sections, the omega’s
purpose is to place the conveyor roller-bed;
Please check correct dimensions and elevation of the Omega steel profile in section H on drawing E540350033_D10_A

Full metal sheet plate (t=5mm)

Side full metal sheet plate (non structural) only for gaps flashing (t=2÷3mm)

Axes 5-6/014-015

Слайд 10

In Base coat and Clear coat zones we have lowered beams because

In Base coat and Clear coat zones we have lowered beams because
we’ll need to locate the Drypan scrubber (basically a big duct with filters) and the conveyor Roller-bed.

Please check our drawings (Booth layouts & sections, Drypan scrubber) for beams elevation;
Basically in these zones the TOP of the cross beams shall be at -505mm from level 4,65m = 4,145m

The bottom of this «tank» will have to be covered by full metal sheet plate (t=5mm)

The tank floor will have to foresee two holes 950x950mm (one per side) for Extraction ducts, see layouts for location

Axes 5-6/014-015

Axes 5-6/015-016

Слайд 11

In this zone the stair that goes on 9,80m level is not

In this zone the stair that goes on 9,80m level is not
alligned to ours

OK to extend platform to these columns

Platform A1 – Oven area

Axes 7/013-014

Слайд 12

Zone: before/after the Heat wall

Please extend platform and handrail until the end

Zone: before/after the Heat wall Please extend platform and handrail until the
of the booth (circa 500mm)

Please extend platform (circa 600mm)

Axes 5/012

Слайд 13

Platform A1 – Oven area
Be sure to respect Oven perimeter when modeling

Platform A1 – Oven area Be sure to respect Oven perimeter when
walkable modules around it

Oven exit (circa 730mm gap)

Oven entry (circa 1,65m gap)

Axes 8/012

Слайд 14

Platform A1 – Oven area
Oven center axis is positioned 3m west of

Platform A1 – Oven area Oven center axis is positioned 3m west
axis 8

145mm

Fill this gap

Axes 7-8/013

Update (08/06): the Oven load is only transferred to the two longitudinal beams on each side, there’s no need to put more beams in the middle;
Also, the beams have to be no more than 145mm.

Слайд 15

Platform D

No walkable modules under this Heater unit.
Supported by side longitudinal steel

Platform D No walkable modules under this Heater unit. Supported by side
profiles

No walkable modules under this Heater unit.
Supported by side longitudinal steel profiles

Keep in mind that we have ducts penetrating platforms under the two Heater groups, these ducts will have insulation (150mm all around).
I will submit information about these duct location in order to avoid clash with supporting beams

Axes 7-8/012-019

Слайд 16

Platform A2 – Demasking & IRC area (axes 8-10/013-015):
The area to be

Platform A2 – Demasking & IRC area (axes 8-10/013-015): The area to
covered with walkable modules shall be the one circled in Yellow, basically under the two open Booths and under Electrical cabinets, as shown on General Layout uploaded in drive on 04 April (rev E – in progress)

Update:
Comment still valid

Слайд 17

Platform A2 – Elevators area (axes 10-12/013-014):

Update:
Still not correct, use General layout

Platform A2 – Elevators area (axes 10-12/013-014): Update: Still not correct, use
to see handrails and platform configuration!

Слайд 18

Platform A2: remember to provide holes with kick-plates around existing columns and

Platform A2: remember to provide holes with kick-plates around existing columns and
bracing (typical) Axes 11-12/014-018

Update:
Comment still valid.
Not priority at the moment but keep it in mind for KM design