Project Files. Equipment

Слайд 2

Equipment

(16) REC 320W TP2M Mono Modules
(1) SE 7600H-US Inverter w/ integrated EV

Equipment (16) REC 320W TP2M Mono Modules (1) SE 7600H-US Inverter w/
Charger
(16) SE P320 Optimizers
(1) 60A Fused AC Disconnect
(2) 40A Fuses
(1) 60A Nonfused AC Disconnect
SnapnRack Ultra-rail (NO FLASHINGS or Lfeet)
S5 Brackets for Corrugated metal
Test Proteabracket? (comes with Lfeet)
Oatey Malleable Metal Roof Boot
Quabbin Cable 300V 4-wire Comms
SolarEdge Consumption and monitoring (Hardwire)
1 story (24 ft ladder)

COOL!

Слайд 3

Site Layout

Inverter w/ EV & nonfused AC disconnect

Fused AC Disconnect & SolarEdge

Site Layout Inverter w/ EV & nonfused AC disconnect Fused AC Disconnect & SolarEdge Energy Meter
Energy Meter

Слайд 4

Panel Layout

Roof 1

Roof 2

Meter Base and Main Panel

Panel Layout Roof 1 Roof 2 Meter Base and Main Panel

Слайд 5

Corrugated Metal 159° Azimuth and 3/12 pitch 2x10 16 o.c. (rafters max span 16’1”)

Corrugated Metal 159° Azimuth and 3/12 pitch 2x10 16 o.c. (rafters max

*S-5! Proteabracket to be tested

Слайд 6

Electrical

No REP on array. No attic under
Penetrate eave(s). Come straight down into

Electrical No REP on array. No attic under Penetrate eave(s). Come straight
inverter w/ EV charger on carport side of home. AC disco #1 beside that
Bring AC wire from AC disco #1 at carport +quabbin communication wire in same conduit under front soffit and down to AC disco #2 at meter. Run AC wire inside and tap in main panel.
Consumption at meter with separate conduit into main panel to 15a breaker, quabbin wire from inverter leads to meter
Main panel is on back wall of cupboard

SolarEdge Consumption Meter

AC Disconnect #2

Слайд 7

Electrical

No REP on array. No attic under
Penetrate eave(s). Come straight down into

Electrical No REP on array. No attic under Penetrate eave(s). Come straight
inverter w/ EV charger on carport side of home. AC disco #1 beside that
Bring AC wire from AC disco #1 at carport +quabbin communication wire in same conduit under front soffit and down to AC disco #2 at meter. Run AC wire inside and tap in main panel.
Consumption at meter with separate conduit into main panel to 15a breaker, quabbin wire from inverter leads to meter
Main panel is on back wall of cupboard

Слайд 8

Permitting Info

8825 Lindley Mill Rd, Snow Camp, NC 27349
Snow Camp
https://alamancecounty.connectgis.com/Map.aspx

Permitting Info 8825 Lindley Mill Rd, Snow Camp, NC 27349 Snow Camp https://alamancecounty.connectgis.com/Map.aspx