Содержание
- 2. Jakarta flood management Part 1: The basics - Spatial Planning Part 2: The flood of February
- 3. Part 1 The basics: Spatial planning “We live in a changing world” The World Bank
- 4. Total urban area % (java-bali spatial plan) 2000 - 2025
- 5. Total urban area % (java-bali spatial plan) 2000 - 2025
- 6. It is really happening Landuse, Jabodetabek 1992 2002
- 7. It is really happening Urban area, G. Pangrango 1992 - 2001 The World Bank
- 8. Land-use & Rainfall runoff (Katulampa) 0 400 0 0.9 m3/s m3/s Fast runoff Urban Slow runoff
- 9. Part 2 Flood February 2007 Hydrology The World Bank
- 10. Daily rainfall Feb 2 Feb 1; 07:00 – Feb 2; 07:00 The World Bank
- 11. Daily rainfall Feb 4 Feb 3; 07:00 – Feb 4; 07:00 The World Bank
- 12. Inflow Ciliwung Febr 2007 Katu Lampa - Manggarai 1 2 3 5 6 7 8 9
- 13. Flood February 2007 Hydraulics & Flood extent Unique “Complete upstream-downstream flood modelling framework now available for
- 14. The World Bank
- 15. The World Bank
- 16. The World Bank
- 17. West Banjir canal
- 18. Part 3 No-regret ST Measures Rehabilitation “Restore original-available design capacity” -Dredging -Dike improvement The World Bank
- 19. 1 August 2007 C: River Embankment Rehabilitation 1. Confirmation of Scope of Works West Banjir Canal
- 20. 1 August 2007 C: River Embankment Rehabilitation 1. Confirmation of Scope of Works Cengkareng Floodway –
- 21. A: Urgent Maintenance Dredging 1. Scope of Works
- 22. West banjir canal design
- 23. No-regret ST Measures “East-Banjir Canal” The World Bank
- 24. Stepwise approach: Cipinang-Sunter-Buaran-Cakung (With increased Cipinang-Sunter capacity) Finish EBC-NE stretch Optimize Manggarai gate Connect with Ciliwung
- 25. Increase capacity
- 26. Increase capacity
- 27. No-regret ST Measures EBC-CAK-CIL-Manggarai Simulation 2007 The World Bank
- 28. EBC-CAK-CIL-Manggarai
- 30. Part 4 Tidal analysis High Tide floods The World Bank
- 31. Animation of tide in South China Sea
- 32. Spring tide analysis Prediction based on analysed tidal constituents Tanjung Priok Only spring tides are plotted
- 33. Flood event June 2007 Increase in water level due to MSLA Spring tide (at semi-annual high)
- 34. Future high spring tides Next semi-annual high spring tide: October 29, November 26, December 24 -2007,
- 35. November 26, 2007
- 36. Subsidence The World Bank
- 37. 1980 2003 Land-use change The World Bank
- 38. Pluit 1989, 2007, 2025 (Positive view) Pasar Ikan cm Nov 1989 Nov 2007 Nov 2025 Nov
- 39. Pasar Ikan cm Nov 1989 Nov 2007 Nov 2025 Nov 26, 2007 Oct 29, 2007 subsidence
- 40. High tide floods 2007: “Signs of a sinking Jakarta” The World Bank
- 41. Jadebotabek Water Resources Management Study (JWRMS,1994) The World Bank
- 42. Part 5 “Strong knowledge base” “Short-term action” The World Bank
- 43. Flood Hazard Mapping Still a lot of confusion!! Who is right? Who is going to solve
- 44. Part 5 Actions and Financing mechanism The World Bank
- 45. ACTION PLAN Short Term: Dredging / East Banjir Canal / Manggarai Gate Stop Ground Water Extraction
- 46. ACTION PLAN Medium Term: Bulk Water Supply Stop Ground Water Extraction (household) Solid Waste Management Low
- 47. ACTION PLAN Long Term: Water Quality Water Retention Basin / Catchment Area / Sea Defense Land
- 49. Скачать презентацию