Содержание

Слайд 2

Objectives

To list the people involved in designing a kitchen
To understand and apply

Objectives To list the people involved in designing a kitchen To understand
the principles of kitchen design
To analyze a kitchen plan
To plan a rough sketch of a kitchen
To distinguish different kitchen types
To recognize the work flow in a kitchen

Слайд 3

Mind Map for Kitchen Design

Kitchen
Design

People Involved

The Owner(s)
Food Service Consultants..
The Manager

Mind Map for Kitchen Design Kitchen Design People Involved The Owner(s) Food Service Consultants.. The Manager

Слайд 4

Mind Map for Kitchen Design

Kitchen
Design

People Involved

Type of Establishment

Food type / Menu
Seating Capacity
Turnover
Opening

Mind Map for Kitchen Design Kitchen Design People Involved Type of Establishment
Hours
Type of Service

Слайд 5

Mind Map for Kitchen Design

Kitchen
Design

Concept

People Involved

The Manager
Food Service Consultants..
F&B Manager
Executive

Mind Map for Kitchen Design Kitchen Design Concept People Involved The Manager
Chef

Слайд 6

Mind Map for Kitchen Design

Kitchen
Design

Concept

People Involved

Implications

Budget available
Kitchen space available
Storage space available
Food offer
Access

Mind Map for Kitchen Design Kitchen Design Concept People Involved Implications Budget
of food delivery
Pickup of garbage

Слайд 7

Mind Map for Kitchen Design

Kitchen
Design

Concept
Design

Kitchen Installations

People Involved

The Manager
Food Service Consultants..
F&B Manager
Executive

Mind Map for Kitchen Design Kitchen Design Concept Design Kitchen Installations People
Chef

Слайд 8

Mind Map for Kitchen Design

Kitchen
Design

Concept
Design

People Involved

Implications

Available budget
Selection of stoves, apparatus
Machines, accessories
Choice of

Mind Map for Kitchen Design Kitchen Design Concept Design People Involved Implications
supplier
Delivery deadlines

Kitchen Installations

Слайд 9

Mind Map for Kitchen Design

Kitchen
Design

Concept
Design
Kitchen installation

Preopening
Period

Preopening

Training of staff
Follow delivery deadlines
Supervise finishing

Mind Map for Kitchen Design Kitchen Design Concept Design Kitchen installation Preopening
of work
Coordinate with service
Menus setups etc.
Organize try-runs for kitchen and service

Слайд 10

Mind Map for Kitchen Design

Kitchen
Design

Concept
Design
Kitchen installation

Opening
Period

Preopening

Make sure that everything is running

Mind Map for Kitchen Design Kitchen Design Concept Design Kitchen installation Opening

smoothly as planned and practiced

Opening

Слайд 11

Kitchen Design Principles

Flexibility & Modularity
Simplicity
Flow of materials and personnel
Easy Supervision
Sanitation
Space

Kitchen Design Principles Flexibility & Modularity Simplicity Flow of materials and personnel
Efficiency

Слайд 12

1) Flexibility & Modularity

MODULAR RANGE SECTIONS

Boiler
Wash Sink
Tilting Pan
Baine Marie

1) Flexibility & Modularity MODULAR RANGE SECTIONS Boiler Wash Sink Tilting Pan Baine Marie

Слайд 13

MODULAR RANGE SECTIONS

Gas Stove Ranges

MODULAR RANGE SECTIONS Gas Stove Ranges

Слайд 14

FLEXIBLE ASSEMBLY LINES

Fix equipment according to the space limit and shape

FLEXIBLE ASSEMBLY LINES Fix equipment according to the space limit and shape

Слайд 15

MOVABLE EQUIPMENT

MOVABLE EQUIPMENT

Слайд 16

MOVABLE EQUIPMENT

MOVABLE EQUIPMENT

Слайд 17

LITTLE OR NO CONCRETE BASES

No
Bases

LITTLE OR NO CONCRETE BASES No Bases

Слайд 18

Simplicity

NO Ramps/Steps

Simplicity NO Ramps/Steps

Слайд 19

NO CONGESTION OR OBSTRUCTIONS

Only What I Need !!!

Properly Stored !!!

Easy

NO CONGESTION OR OBSTRUCTIONS Only What I Need !!! Properly Stored !!! Easy Access !!!
Access !!!

Слайд 20


Flow of Food/Personnel

Your kitchen should be designed to handle events that

Flow of Food/Personnel Your kitchen should be designed to handle events that
occur as part of food preparation in sequential order.

Слайд 21

Receiving

Receiving

Слайд 22

Storing

Dry Storage

Cooled Storage

Adjacent

Storing Dry Storage Cooled Storage Adjacent

Слайд 23

Preparation

Close/Adjacent

FLOW

A

B

Preparation Close/Adjacent FLOW A B

Слайд 24

Final Preparation/Cooking

Food is Cooked, Plated and Garnished

Final Preparation/Cooking Food is Cooked, Plated and Garnished

Слайд 25

Serving

No disruption by waiting staff i.e. easy access.
Separation should exist between chefs

Serving No disruption by waiting staff i.e. easy access. Separation should exist between chefs and waiters
and waiters

Слайд 26

Clearing/Ware Washing

Clearing/Ware Washing

Слайд 27

Waste disposal

Direct access out

Waste disposal Direct access out

Слайд 28

Flow of Food/Personnel

Flow of Food/Personnel

Слайд 29

Easy Supervision

Half walls/Glass windows

Chef’s office with kitchen views

Easy Supervision Half walls/Glass windows Chef’s office with kitchen views

Слайд 30

Sanitation

Easily washable and durable materials
Wall hung equipment
Proper drainage and washable ceilings

Sanitation Easily washable and durable materials Wall hung equipment Proper drainage and washable ceilings

Слайд 31

Space Efficiency

Isle Space Work Surface Sink Storage Space Equipment Storage

Space Efficiency Isle Space Work Surface Sink Storage Space Equipment Storage

Слайд 32

Types of Kitchens

Types of Kitchens

Слайд 33

Types of Kitchens

Conventional

Fast Food

Production

Satellite

Includes all the sections in

Types of Kitchens Conventional Fast Food Production Satellite Includes all the sections
one room e.g. Smaller restaurants and
Bistros.
Typical kitchen that has a Storing Room , Cooking Room and a Serving Area.
Used for banqueting and preparation phases. Large equipment for mass production.
Auxiliary Kitchen independent from the main preparation kitchens.
Open Kitchen dependant on the main/satellite kitchen.

Show

Слайд 34

Conventional Kitchen

Conventional Kitchen

Слайд 35

Conventional Kitchen Plan

Preparation / Cold Section

Pastry

Hot Section

Storage

Pass

Conventional Kitchen Plan Preparation / Cold Section Pastry Hot Section Storage Pass

Слайд 36

Fast Food

Fast Food
Kitchen

Storing Area

Cooking Area

Serving Area

Fast Food Fast Food Kitchen Storing Area Cooking Area Serving Area

Слайд 37

Production & Satellite Kitchen

Production & Satellite Kitchen

Слайд 38

Production & Satellite Kitchen Plan

A B C

Production & Satellite Kitchen Plan A B C

Слайд 39

Show Kitchen

Show Kitchen

Слайд 40

Show Kitchen

Glass walls or open to the publics view

Show Kitchen Glass walls or open to the publics view

Слайд 41

Plan of Show Kitchen

Glass/ Open

Plan of Show Kitchen Glass/ Open

Слайд 42

Kitchen Design in 3-D Perspective

Pot Wash

Exit

Entrance

Kitchen Design in 3-D Perspective Pot Wash Exit Entrance

Слайд 43

Getting used to Plans !!

Hot Pass

Cold Pass

Meat

Freezer

Daily

Banquet

Dairy

Veg.

Pastry

Garde manger

Entremetier

Saucier

Poissonier

Dry Store

Getting used to Plans !! Hot Pass Cold Pass Meat Freezer Daily

Слайд 44

Exercise on Work Flow

Exercise on Work Flow
Имя файла: Kitchen-design-.pptx
Количество просмотров: 99
Количество скачиваний: 0