Overall outline of equipment

Слайд 2

Rotating dual station

Forming manipulator

Material receivingbox

Forming and picking station

Discharge station

Positioning fixture (stainless steel)

Rotating dual station Forming manipulator Material receivingbox Forming and picking station Discharge

Слайд 3

Equipment process flow chart

1
Manually insert the product into the positioning fixture

2
Start double

Equipment process flow chart 1 Manually insert the product into the positioning
button, dial rotate 180 degrees

3
Forming manipulator movement, the needle bending angle, hot hair dryer will start the needle shaped


4
After forming, the manipulator takes the needle tube into the material box
After forming, the manipulator takes the needle tube into the material box

5
Turntable rotating 180 degrees to the manual discharge station

Cycle time :17s(Bending 6s+hot blow forming 8s+unloading 3s)
Single product time :2.8s/pcs
Single equipment capacity: 3600s/2.8s=1285pcs/h

Слайд 4

Heating cylinder

Splint

Rotating disk

Positioning jig

Slide cylinder

Translation cylinder

Bending cylinder

Hot tip

Receiving box

The needle tube

Heating cylinder Splint Rotating disk Positioning jig Slide cylinder Translation cylinder Bending
is rotated to the forming station, and the cylinder motion splint is moved to the needle tube

Clamp the needle tube bending, heating cylinder down, hot wind near the elbow, hot blow points start, needle shaped

After the needle tube is formed, the slide cylinder is lifted, the needle tube is lifted out of the jig, and the translational cylinder is retracted to the top of the receiving box

Needle tube forming and blanking

Слайд 5

Equipment dimensions

Equipment dimensions