- 2. Site Preparation / Site Clearance is a work of clearing the ensure that the project site,
- 3. Site Clearance / Site Preparation Element: Site Clearance or Site Preparation
- 4. Site Clearance / Site Preparation Element: Site Clearance or Site Preparation
- 5. Site Clearance / Site Preparation Element: Site Clearance or Site Preparation
- 6. STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 T.Off List SITE PLAN
- 7. STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 T.Off List SITE PLAN
- 8. SMM2 T.O LIST 105.00m 145.00m 210.00m Symbol :
- 9. SMM2 T.O LIST Symbol :
- 10. 1. Clearing undergrowth m2 2. Cutting down trees not exceeding 300mm girth No Taking Off List
- 11. T.O List SITE PLAN SMM 2 Clearing site Area Ave. length 105.00 Add 145.00 2 250.00
- 12. Cutting down trees 1 m According to D5 SMM2 page 16 SECTION D U = Girth
- 13. Cutting down trees U = 1000 U = 900 U = 300 U = 250 U
- 14. T.O List SITE PLAN SMM 2 Clearing site Area Ave. length 105.00 Add 145.00 2 250.00
- 15. T.O List SITE PLAN SMM 2 Cutting down trees Cutting down trees n.e 600mm b.n.e 900mm
- 16. Cutting down hedges High Length According to D2SMM2 page 16 SECTION D T.O List SITE PLAN
- 17. T.O List SITE PLAN SMM 2 Cutting down trees Cutting down trees n.e 600mm b.n.e 900mm
- 18. Element: Site Clearance or Site Preparation
- 19. 1. Specify the type of material used to bury behind the hole according to the classification