Казахстанское оборудование. График установки
OLT Установка (3.5) Проэктирован. / Произв. Тест (1.0) Контрольный (1.5) Спец.. Детальн. план Marking (5/1∼5/30) Design/ Production OLT Design/Production Spec. Detail Plan Utility Preparation Marking OLT Spec. Confirm Install OLT Fabrication Plan Spec. Confirm Install/Test (7/1∼7/31) 6/17,Start 9/2,Start∼ Design Фундамент, Стальные конструкции Пол,стены,крыша Utility / finish Инфрастр, ландшафт и т.д. Design/Production order HCr SOP : ’21.1/1 HCr SOP : ’21.1/1 7/1 6/1 5/20 1/28 Delay Construction Revised Тест 2 (1.0) Prepare Install/Tryout (8/1∼8/31) Tender Clinic Car (8/15∼9/15) 6/1 SMPL Assemble(9/15) 5/1 Installation (3.5) Test (1.0) Cont. Test (1.0) PILOT (1.5) Test Cont. Test PILOT (1.5) Local Storage Local Storage Jig & Inspection Jig production - Design/production: HMC (Ass’y Jig: Astana) ) Local Structure Install Local Trolley Fabrication(9/30) 제작중단(3/16) SKD Assemble: ’20.9/15 1/28 Unpacking Local work and Building Complete 5/20 8/30 Utility, material and chemical supply 9/15 Local Structure Install 5/20 Unpacking(5/15∼7/1) Utility Supply(6/15∼ ) TLA : ‘19.9.23 SOP schedule change ? Plant construction delay(2M) - Original : '20.11/1 - To be changed : '21.1/1 Сварка кузова (7/1) Now 8/1 ▣ График установки(1/2) 1. Install steel structure: ~ 5/30 2. Install 1st utility in the shop(ind water, air, electricity):~ 6/15 3. Epoxy primer on the floor: ~ 6/25 4. Move and unpack equipment into the shop: ~ 6/30 5. Prepare for manpower and tools for installation: ~ 6/30 1. Epoxy primer on the floor: ~ 5/25 2. Pave the roads around the paint shop(for the equipment moving): ~ 5/30 3. Move and unpack equipment into the shop: ~ 5/30 4. Prepare for manpower and tools for installation : ~ 5/30 5. Install 1st utility in the shop (ind water, air, electricity, gas, steam): ~ 5/30 1. Install steel structure: ~ 5/20 2. Install 1st utility in the shop (ind water, air, electricity): ~ 5/20 3. Move and unpack equipment into the shop: ~ 5/20 4. Prepare for manpower and tools for installation: ~ 5/20 Utility Supply(6/15∼ ) Дата:15 Мая 2020 5/20 7/1 Установка (5/20) Покраска (6/1) 6/1 4/1 ▣ Список вещей для установки (2/2)